We started our oven back in May. It has been alot of fun working on it, once we overcame our fears of "just doing it". This forum has helped out alot especially CanuckJim who was a tremendous help during and even after the build. Here are some pictures.
Laying out the block foundation
[IMG][/IMG]
First block down. Me on the right, neighbor on the left.
Base is up and ready for insulation and concrete slab.
4 inches of insulation below the slab and the slab poured.
Laying out the block foundation
[IMG][/IMG]
First block down. Me on the right, neighbor on the left.
Base is up and ready for insulation and concrete slab.
4 inches of insulation below the slab and the slab poured.
Comment