After another hiatus, I am back working on my son's oven. First of all apologies to Marko for not responding to your post - I somehow missed the notification email but hopefully this update will answer your question.
My daughter-in-law made a nice job of adding mosaic tiles to the arch using some heat resistant tile adhesive and I set the arch on a bed of mortar whilst holding it in place temporarily with string. I fitted 2 x 25mm layers of ceramic blanket to the dome (reduced to 1x 25mm around the gallery) and fixed the stainless steel flue pipe with a 5:1 vermicrete mix which I extended up the pipe maybe 150mm. All very straightforward so far and ready for the vermicrete outer layer.
My daughter-in-law made a nice job of adding mosaic tiles to the arch using some heat resistant tile adhesive and I set the arch on a bed of mortar whilst holding it in place temporarily with string. I fitted 2 x 25mm layers of ceramic blanket to the dome (reduced to 1x 25mm around the gallery) and fixed the stainless steel flue pipe with a 5:1 vermicrete mix which I extended up the pipe maybe 150mm. All very straightforward so far and ready for the vermicrete outer layer.
Comment