Re: CVB Oven Build
On 3/21 built the form; just placed the 2x4s holding the form in place directly on the sandstone. Also added to the mountain of quikcrete in the garage.
For comparison I called a local cement company about a truck. It's $260 for the yard (I estimated needed 0.75) and they allot 10 minutes to unload with $2 minute beyond the 10. Decided hand mixing might not be so bad.
X
-
CVB Oven Build
Hello all,
I have been lurking for a while in the forum, admiring all of your hard work and craftsmanship and have taken the plunge.
I started on 3/20 by confirming the site and excavating for the foundation.
After digging down between 8 and 14 inches I hit a solid sandstone boulder.2 PhotosTags: None