7 am tomorrow. 350 square feet or so to be filled with "Dakota Clay" dyed concrete, 4" thick, stamped with a granite pattern.
The gray curvy things in the front are the steps up to the patio.
I'll have to build a retaining wall along the left, CMU with stone veneer. WFO will go in the back left corner. Tentative finish date - sometime late next summer.
The gray curvy things in the front are the steps up to the patio.
I'll have to build a retaining wall along the left, CMU with stone veneer. WFO will go in the back left corner. Tentative finish date - sometime late next summer.