Re: Round shape
I was thinking of pouring a vermicucrete layer to go under the ceramic board for a double insulation (I know over kill, but keeping the floor hot is the name of the game right). The mix in the plans call for 5 to 1, this is done by volume? As in 2 (4 cf bags) and 2 90lb bags of portland cement?
Any one have a good way to measure these?
Mike
I was thinking of pouring a vermicucrete layer to go under the ceramic board for a double insulation (I know over kill, but keeping the floor hot is the name of the game right). The mix in the plans call for 5 to 1, this is done by volume? As in 2 (4 cf bags) and 2 90lb bags of portland cement?
Any one have a good way to measure these?
Mike
Comment