Announcement

Collapse
No announcement yet.

Gaps in floor and expansion joint

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Gaps in floor and expansion joint

    Hello all,

    I set my floor today in the fireclay and sand mixture. I cut the floor so the dome will rest outside the floor. I was wondering about two things before I proceed.

    1. Do I need to leave room for the floor to expand when I set the soldier course or do you just mortar them right to the side of the floor.
    2. Do you fill the gaps in the floor with anything? I have some gaps where the bricks don't quite touch, nothing major, 1/8" max; just seems like it would collect flour and stuff.

    I will post pics in my thread at:
    http://www.fornobravo.com/forum/f8/3...aks-16176.html

    Best,

    Chris

  • #2
    Re: Gaps in floor and expansion joint

    Chris,

    Yes, leave a gap for the floor to expand. I left 1/8". Some guys place a piece of cardboard around the floor as they build their first course.

    As far as floor brick gaps go, don't sweat them. They will fill with ash.

    John

    Comment

    Working...
    X