I finally finished the Pompeii style dome on Friday. I have a 'possible' pizza party scheduled for the 22nd. I will let it sit for a week probably with a shop light inside it to at least begin some of the drying. It had styrofoam forms with sand holding them and the sand got soaked due to rain. I plan to do the proper slow curing process.
My questions are:
1) I'd like to get inside the dome and 'grout' any open joints with heat stop or is this not necessary (I'm no mason and it is FAR from perfect)?
2) I have two rolls of fire blanket that I plan on covering the dome with then layering vermicrete on top of that. Should I just layer the blankets on and use that way and after the party install the layer of vermicrete?
Any comments or suggestions are greatly appreciated by this noob.
My questions are:
1) I'd like to get inside the dome and 'grout' any open joints with heat stop or is this not necessary (I'm no mason and it is FAR from perfect)?
2) I have two rolls of fire blanket that I plan on covering the dome with then layering vermicrete on top of that. Should I just layer the blankets on and use that way and after the party install the layer of vermicrete?
Any comments or suggestions are greatly appreciated by this noob.
Comment