i poured my foundation with a very slight grade to run water off, and when i dry-stack the blocks for the front and back walls of my stand they are slightly off plumb, about 1/2" for 39" in height, correlating with the slope of the slab.
is this a serious enough issue that i should level the first course with mortar? the rest of the stand is level.
is this a serious enough issue that i should level the first course with mortar? the rest of the stand is level.
Comment