Re: 36" Pompeii in DC
RS, I think I read something from Stonecutter that said a 2-2.5:1 ratio of sand to portland was best and to be sure it was course sand not rounded. Take a look at the latest posts on Gulf's thread for the specific quote/context.
As far as "grinding now" or filling with the slurry I don't know what advantage grinding now would give you, since you will have to grind it down after you lay the slurry anyway. Maybe grinding now would allow you to control the placement of the slurry coat. I'm only thinking out loud...you are WAY ahead of me on this....But I am watching and learing from your experience...Looks very promising so far.
Thanks for sharing.
Regards,
AT
RS, I think I read something from Stonecutter that said a 2-2.5:1 ratio of sand to portland was best and to be sure it was course sand not rounded. Take a look at the latest posts on Gulf's thread for the specific quote/context.
As far as "grinding now" or filling with the slurry I don't know what advantage grinding now would give you, since you will have to grind it down after you lay the slurry anyway. Maybe grinding now would allow you to control the placement of the slurry coat. I'm only thinking out loud...you are WAY ahead of me on this....But I am watching and learing from your experience...Looks very promising so far.
Thanks for sharing.
Regards,
AT
Comment