I am in the beginning stages of my "oven journey" and I got the foundation poured today. I thought about doing it with 80# bags, but because I turn 41 tomorrow and want to be able to sit upright for my b-day dinner I opted on premix in a pull behind mixer. Man is that the way to go!!! I would have needed about 30-35 bags of concrete at about $4 a bag to have to load/unload and move to mix by hand and it cost me $127 for 3/4 yard of premix/trailer. From the time I walked in to rent it, pour it and returned, it was less than 1.5 hours and my back is doing just fine.
I thank everyone for all the great info and pics on this site..and I look forward to posting a few off my own as I progess.
I thank everyone for all the great info and pics on this site..and I look forward to posting a few off my own as I progess.
Comment