this weekend i made a start on my wood fired oven, poured reinforced slab in the back garden and have materials to get the block walls and suspended slab done over the next couple of weeks.
the design is based upon the FB pompeii oven plans and info from this forum and one in the UK.
I have got hollow blocks which i plan to dry lay and fill cores with concrete and rebar which will then tie into suspended slab.
my first question is do people recommend adding a dpc in addition to the dpm below the foundation slab, if so what level should it go in at - if it goes above first course then there is no continuity of the reinforced cores (i.e. the first course will be hollow and not tied into upper blocks).
once the suspended slab has been poured i was planning to use a insulation board rather than pouring insulation - the garden is small and no access so i have to barrow through the house, along with the improved performance?
any tips/advice is greatly appreciated!
cheers
toby
this weekend i made a start on my wood fired oven, poured reinforced slab in the back garden and have materials to get the block walls and suspended slab done over the next couple of weeks.
the design is based upon the FB pompeii oven plans and info from this forum and one in the UK.
I have got hollow blocks which i plan to dry lay and fill cores with concrete and rebar which will then tie into suspended slab.
my first question is do people recommend adding a dpc in addition to the dpm below the foundation slab, if so what level should it go in at - if it goes above first course then there is no continuity of the reinforced cores (i.e. the first course will be hollow and not tied into upper blocks).
once the suspended slab has been poured i was planning to use a insulation board rather than pouring insulation - the garden is small and no access so i have to barrow through the house, along with the improved performance?
any tips/advice is greatly appreciated!