I am looking at a full day tomorrow to get some work done.
This may sound silly, but I was wondering if it was OK for me to pour the first layer of the hearth on the same day that I pour concrete into the block stand holes. Or should I let the block stand "pillars" cure a bit before proceeding?
This may sound silly, but I was wondering if it was OK for me to pour the first layer of the hearth on the same day that I pour concrete into the block stand holes. Or should I let the block stand "pillars" cure a bit before proceeding?