I am sure this has been covered multiple times but with the site having some links not active thought it would be easier to ask again.
I am getting ready to start laying courses for the dome and want to have a good idea of what I need to do on the opening arch.
Should arch be built as I lay courses or build it first and run the courses into it?
Is the reveal typically cut into the bricks that make the opening arch or is it created by building a second arch a 1/2" - 1" larger?
Should I build the opening arch from half bricks or full bricks?
Is it better to have the arch move back to meet the dome as you build up? or have the bottom of the arch stick into the dome ( come straight down from the top of the arch on the inside of the dome)?
I am getting ready to start laying courses for the dome and want to have a good idea of what I need to do on the opening arch.
Should arch be built as I lay courses or build it first and run the courses into it?
Is the reveal typically cut into the bricks that make the opening arch or is it created by building a second arch a 1/2" - 1" larger?
Should I build the opening arch from half bricks or full bricks?
Is it better to have the arch move back to meet the dome as you build up? or have the bottom of the arch stick into the dome ( come straight down from the top of the arch on the inside of the dome)?