Forms removed this morning (June 12) and keeping it wet. The arch is perfect, no cracks (it has been 12 days I think). Interior slab supports will remain for a week or two.
Will keep it wet for a few days - I don't think it will matter - the mix was great and there is so much rebar, that I can't fathom shrinkage cracks. But better safe than sorry. My eagerness to get the dome started may change the plans for watering!
As a side note:
I mentioned footers for the timber frame - 3 feet deep and roughly 20x20 = 8.33 Cubic Feet = ~1250 pounds. So solid footing for the timberframe and plenty of ballast for uplift prevention of the timberframe. At 5000 pounds + the weight of the structure (lets call it 1500 pounds). The roof area will be ~145 square feet. So maximum uplift resistance would be 6500/145 = 44psf. I calculated worst case for the proposed structure (using skyciv) to be about 22psf (and that is basically tornado winds). So more bomb shelter engineering!
-Bean