    It may look as though have some of the light stuff in the lower part, but not the case. Bottom half (3.5") is structural concrete with reo bars.

    Leave a comment:


  • david s
    replied
    I hope you didn’t include either vermicrete or perlite in that foundation slab. It decreases the strength of concrete enormously. Only use it for insulation.

    Leave a comment:


  • KISS4me
    replied
    Following the information and wise advice from this forum I have completed my base now. See photos at https://www.flickr.com/photos/129613...57715344888848.
    I would not advise mixing the perl/verm on a windy day like I did!

    Leave a comment:


  • MarkJerling
    replied
    Originally posted by KISS4me View Post
    Well timed advice Mark as I was about to remove form tomorrow. Much appreciated. Will wait.
    Better safe than sorry!

    Leave a comment:


  • KISS4me
    replied
    Well timed advice Mark as I was about to remove form tomorrow. Much appreciated. Will wait.

    Leave a comment:


  • MarkJerling
    replied
    Originally posted by KISS4me View Post
    Poured hearth concrete yesterday and keen to remove supporting boards from underneath to punch out weep holes and then do layer of perm/verm mix.
    My question is about the timing of board removal - Is 40 hours adequate? A collapse or slump would be devastating.
    No, much too quick! Leave for a minimum of 7 days. I left mine for 28 days which is excessive, but concrete gains most of it's strength between 7 and 90 days. At 40 hours (less than 2 days) you still have a very, very weak "green" slab.

    Click image for larger version

Name:	COMPRESSIVESTRENGTHWITHAGE.jpg
Views:	227
Size:	37.7 KB
ID:	432681
    Last edited by MarkJerling; 11-10-2020, 03:14 PM.

    Leave a comment:


  • KISS4me
    replied
    Poured hearth concrete yesterday and keen to remove supporting boards from underneath to punch out weep holes and then do layer of perm/verm mix.
    My question is about the timing of board removal - Is 40 hours adequate? A collapse or slump would be devastating.

    Leave a comment:


  • MarkJerling
    replied
    Originally posted by KISS4me View Post
    Thought about getting concrete in, but have a mixer and need to toughen up! Have spent half a day preparing the reo and filling gaps (mainly due to using rock in walls. Seem to be using a fair bit of newspaper and cardboard.
    Check photos and any observations/feedback pre pour greatly appreciated. I would be on shattered bloke if this leaked everywhere or worse still collapsed. Still need to set up weep holes and planning to use a bit more duct tape to seal various small gaps.

    Link to photos: https://www.flickr.com/gp/12961365@N00/9at0L4
    Looking good!

    Leave a comment:


  • KISS4me
    replied
    1500cm or 60" wide. Should be enough.

    Leave a comment:


  • Neil.B
    replied
    Great job so far, well done.
    Is your hearth big enough, it only looks about 48" wide.

    Leave a comment:


  • KISS4me
    replied
    Thought about getting concrete in, but have a mixer and need to toughen up! Have spent half a day preparing the reo and filling gaps (mainly due to using rock in walls. Seem to be using a fair bit of newspaper and cardboard.
    Check photos and any observations/feedback pre pour greatly appreciated. I would be on shattered bloke if this leaked everywhere or worse still collapsed. Still need to set up weep holes and planning to use a bit more duct tape to seal various small gaps.

    Link to photos: https://www.flickr.com/gp/12961365@N00/9at0L4

    Leave a comment:


  • MarkJerling
    replied
    Sounds like hard work! I found a Readymix truck made life much easier. LOL

    Leave a comment:


  • KISS4me
    replied
    Have put in a few hard days on oven build. Progress has been slow, but have stand walls completed and well into hearth form work. Took me a full day to get base in place and outside box frame. Can't remember it taking this long last time! Next step is getting the reo (and two weep holes) in place ready for pour. Planning 3.5" concrete and 4" perlite/vermiculture mix. Mixing and shovelling concrete into mold is feeling like hard work.
    Photostory here: https://www.flickr.com/gp/12961365@N00/5f03PG

    Leave a comment:


  • MarkJerling
    replied
    At least you're out of the ground! Progress. COVID lockdown delayed my start but, other than the door, I'm done!

    Leave a comment:


  • KISS4me
    replied
    Progress has been very slow, but back into it now. have started doing limestone rock inlay in base and am assembling materials and ideas for hearth pour. Update photos are available at https://www.flickr.com/photos/129613...57715344888848

    Leave a comment: