Hi All
What an exciting afternoon....
Ive just had my first big fire ( it was a beauty ) in my oven and theres a crack at the very top with whisps of smoke where coming through...see pic
its about 5 ins long
The oven is only small 32 ins so gets hot quick ive not insulated it with a blanket or outer vermiculite yet but did 2 good coats of refrac cement especially above the top centre...
Ive had 4 fires up to date going upto around 200C with one layer of cement on and the outer dome didnt get even get hot, then all of a sudden today with a bigger fire came the crack... even with 2 layers of good refrac cement ( Maybe i didnt give the 2nd layer long enough to harden ).....Im sure that with a fire blanket and vermiculite over top I wouldnt have even noticed the cracks..
The heat of the dome inside at the top when it happend was 300C
and outside is is currently ( where the crack is ) is 80C ...so heat is escaping
the dome keystone etc is all very very tight and well built and not packed between joints with mortar and im more than happy with my dome build..
But Whats best to do now???...
leave it and put another layer of concreate over the top and carry on with the insulation blanket etc
or chip it /grind it away back to the brick below the crack and re-cement the 2 layers...then put my outer insulation over and stop messing around...lol
advice please
What an exciting afternoon....
Ive just had my first big fire ( it was a beauty ) in my oven and theres a crack at the very top with whisps of smoke where coming through...see pic
its about 5 ins long
The oven is only small 32 ins so gets hot quick ive not insulated it with a blanket or outer vermiculite yet but did 2 good coats of refrac cement especially above the top centre...
Ive had 4 fires up to date going upto around 200C with one layer of cement on and the outer dome didnt get even get hot, then all of a sudden today with a bigger fire came the crack... even with 2 layers of good refrac cement ( Maybe i didnt give the 2nd layer long enough to harden ).....Im sure that with a fire blanket and vermiculite over top I wouldnt have even noticed the cracks..
The heat of the dome inside at the top when it happend was 300C
and outside is is currently ( where the crack is ) is 80C ...so heat is escaping
the dome keystone etc is all very very tight and well built and not packed between joints with mortar and im more than happy with my dome build..
But Whats best to do now???...
leave it and put another layer of concreate over the top and carry on with the insulation blanket etc
or chip it /grind it away back to the brick below the crack and re-cement the 2 layers...then put my outer insulation over and stop messing around...lol
advice please
Comment