If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Any feel for minimum thickness the slab should be?
I'm not sure. I went 3 1/2 and felt that was minimum. It only gave me 1 1/2 inchs of concrete above and below the rebar. I spaced my rebar grid around 10 - 11 inches. I supposed if you went overkill on the steel you could get away with a smaller slab. Is there an issue with the recommended thickness?
Hi Bill,
Not sure if the cement board is designed for that kind of load. Since you are able to weld, perhpas yoo could consider using some 2" angle to create a form and poue a 2" slab reinforced with 1/4" rebar grid. You could even weld the rebar to the 2" angle for suport while you pour. Hope this helps,
Cheers,
John
I intend to use a metal (steel) frame for the base. Does anyone know what the different support strength would be if you used 3 or 4 layers of cement board stacked rather than a 4" slab?
Hi Bill,
Nice to see I?m not the only one dodging snow, wind, and rain in an attempt to build a northwest Pompeii oven. I just managed to pour my hearth slab last Sunday and my vermiculite concrete yesterday. With a little luck, I hope to complete by May.
I got my wet saw second hand. Try craigslist.com, I saw several options there today.
Good luck with your project.
Cheers,
A lot of us bought the Harbor Freight 10" wet saw. Harbor Freight Tools - Quality Tools at the Lowest Prices
It's more expensive than when I bought it, but I understand they go on sale from time to time. Look for a retail branch to save freight.
After a couple of months of learning, lurking and waiting for the last snowfall to melt I've finally moved to the next step of pouring a slab.
We've finished with our 2 weeks of snow and now just wait for days without rain. It was supposed to be cloudy but dry. It wasn't. If one waited for cloudy and dry at this time of year I wouldn't be eating pizza till next fall.
I was able to spend a little of that time welding up a stand rather than using cement blocks. Figured it might save a little weight.
My thanks to all the mentors, their patience and their wisdom on this forum. It certainly allows us newbies to move from the head scratching to actually mixing cement.
A couple of questions....
I haven't decided on whether to buy, borrow, or steal a wet saw. If I were to buy one (and somehow rationalize it to my wife...), any suggestions on make, model, or blade size?
I will post a link below to the pictures I've taken to-date.
Leave a comment: