Re: Greg's Pompeii 42" - San Diego
I think I took my forms off after 3 or 4 days to hasten the drying process. I don't think it helped. It was easily 4-6 weeks later that I cut back into the stuff in the area of the entryway. It was still very moist in the middle of the layer.
I think I took my forms off after 3 or 4 days to hasten the drying process. I don't think it helped. It was easily 4-6 weeks later that I cut back into the stuff in the area of the entryway. It was still very moist in the middle of the layer.
Comment