I've just finished the Pompeii dome and am looking for some perspective:
1. The inside brick joints on the last 2 - 3 courses are not as elegant as they probably should be. There are a number of gaps between bricks that are probably in the 0.5" - 0.75" range. Is it best to fill these gaps by pointing them with mortar from the inside or just let them be?
2. Once completed, is it helpful to cover the exterior of the dome with a 0.25" - 0.5" skim coat of refractory mortar to ensure that all the joints are filled from the outside? Additionally, I have many small pieces of firebrick remaining, is there any advantage to embedding them in the final mortar coat to provide a little more mass prior to wrapping it with the ceramic blanket.
As always, thanks in advance for your input.
Mark
1. The inside brick joints on the last 2 - 3 courses are not as elegant as they probably should be. There are a number of gaps between bricks that are probably in the 0.5" - 0.75" range. Is it best to fill these gaps by pointing them with mortar from the inside or just let them be?
2. Once completed, is it helpful to cover the exterior of the dome with a 0.25" - 0.5" skim coat of refractory mortar to ensure that all the joints are filled from the outside? Additionally, I have many small pieces of firebrick remaining, is there any advantage to embedding them in the final mortar coat to provide a little more mass prior to wrapping it with the ceramic blanket.
As always, thanks in advance for your input.
Mark
Comment