I was looking at the Materials list and it indicates that you need 46 80lb bags of concrete.
What is the recommended minimum thickness be...a 3" thicks slab from my calculations would be 26 80lb bags...
does anyone know of a way to calculate the number of bags required I am not sure my calcs are correct.
What is the recommended minimum thickness be...a 3" thicks slab from my calculations would be 26 80lb bags...
does anyone know of a way to calculate the number of bags required I am not sure my calcs are correct.





. Even so, you've just spent $900 more than you would if you mixed by hand, with a shovel. Wait a minute. You've got 2 grand in the bank, right? You're still $1100 in the black. More than enough for a couple of boxes of beer, and you haven't listed the water you'll need to wet up those bags and bags of dry mix.