Hello,
I built my stand and poured the concrete hearth this past weekend. I covered the wet slab with burlap to keep it moist overnight and in the morning I found some of the portland cement had coated the surface of the concrete, maybe a total of a cup for the entire slab. I assume the burlap helped wick this. The slab seems solid but how do I tell? Also, how long should I let it cure before I start with the insulating layer of portland and perlite?
I built my stand and poured the concrete hearth this past weekend. I covered the wet slab with burlap to keep it moist overnight and in the morning I found some of the portland cement had coated the surface of the concrete, maybe a total of a cup for the entire slab. I assume the burlap helped wick this. The slab seems solid but how do I tell? Also, how long should I let it cure before I start with the insulating layer of portland and perlite?
Comment