Re: Greg & Karen's 42" Deck WBO in MI
I mixed up a bucket of homemade mortar (1 lime : 1 fireclay : 1 portland cement : 3 parts fine sand), and decided that since I still had some daylight left, I'd start assembling the bricks. I really like how well the homemade mortar works.
It wasn't long before I had to turn on the lights in the hut, but I actually got the entryway AND the soldier course assembled -- I'm really pleased with how much I was able to accomplish today...and it's still 60 degrees outside at 8:30 at night! That's amazing considering how much sub-32 degree weather we've had recently at night.
Tomorrow I'll start the second course of bricks, and keep working until I can't stand up anymore.
.
Greg & Karen's 42" Deck WBO in MI
Collapse
X
-
Re: Greg & Karen's 42" Deck WBO in MI
Nice job guys,,,, An incredible build
Cheers
MarkLeave a comment:
-
Grand Rapid's Latest Pizza Hut!
Well, it looks like we're going to have a few nice warm days ahead (50's plus), so I've decided to jump back into the WFO project! I enclosed the canopy, and added a kerosene heater and lighting so that we can continue to work for a few weeks if the weather turns on us again. I'm determined to get the dome built before the snow comes!
I cut the oven floor bricks earlier this week in the garage, and assembled them onto the insulation board with the 50/50 fireclay and sand mix for leveling.
Today I cut the entry bricks, and cut the soldier course bricks at a 15 degree angle using a simple wood jig screwed to the HF tile saw. It worked great.
.4 PhotosLeave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Greg, i took the forms off of my hearth last nite, thought it turned out pretty good. i'll start another Michigan thread here pretty quick. your start looks great! i noticed you still have your pool open?? i'm trying to figure out how i can cut and number my bricks inside and be ready to assemble everything in the spring.Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Greg and Karen - keep it up. We'll keep hoping for warmer weather.
Great setup you have there. You're going to have a terrific venue for entertaining.Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Stonylake: I went with the U-Haul it cement route too and loved it.
Greg: Impressed you can still smile while pouring cement in the cold wet weather
! But after looking at your finished base, I'd keep going too. It's looking really nice. A few days of curing and you'll ready for firebricks. This parts exciting. I'm sure you'll get enough good weather soon. Cheers, Dino
Leave a comment:
-
Greg & Karen's 42" Deck WBO in MI
We finally got a few nights above 32 degrees, so we decided to pour the top slab. The high temps reached into the upper 50's for two days in a row, but it looks like next week's highs are going to stay in the 40's...this is our coldest October in over 30 years on record!
I put a canopy over the oven, and may need to "shroud" it and place a heater inside if I want to continue with the oven project into the "fall". The top slab pour went very quickly with Karen manning the cement mixer, and only took 32 - 60# bags of concrete mix.
Due to continued rain, I think I'll start cutting and assembling the bricks in the garage. If we get a few more warm, dry days, I may have the chance to assemble the dome before the first snow fall.
-5 PhotosLeave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
hi Greg. i did pour yesterday. picked up 1/2 yard of concrete at 9 and returned the trailer at 11. you have to work fast, the concrete wants to set up in the trailer. kept it wet till late in the day, and i think that even though it froze hard last nite, i'm ok. time to find brick, set up the wet saw in my shop and settle in for the winter. i may try to make a mould, cut and set and number all my bricks and be ready to assemble in the spring...there was a GREAT custom home builder that lived out by you.. Jordan Sheperd..did you every meet him?Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Greg, I stopped at the U Rent It on 28th SW yesterday. They sell redi-mix in trailers. My hearth slab is about 6'x6'x4", which is about 1/2 yard of concrete. $100.00 for 1/2, $159 for 1 yard. This will probably be the last weekend of the season that they sell redi-mix. Sounds a lot better to me than carrying 20 some 80# bags to the mixer in my back yard. A wheelbarrow fits under the trailer....Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Hi Greg. I tried to post earlier and had a computer problem. Don't know if you recieved it or not. I started my build on 9/18 and hope to pour my hearth slab this weekend. I'll call it quits for the season after that, may build my arch in my shop this winter. I have a couple of sheets of 4x8 cement fiber siding in the warehouse with broken corners, I'm going to pour over that and just leave it in place afterward. It looks like the weather will cooperate Saturday, shouldn't freeze for a couple of days...Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Enjoy the journey. It's great fun.
JoeLeave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Greg & Karen
NIce job so far, great enthusiasm,,,, Build fast and enjoy...
Cheers
MarkLeave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Dino,
We just formed up the boards for the upper slab and it will be 4" thick with 2" of FB Board on top. We're just waiting to pour next week because the weather is supposed to be above 32 degrees again!
GregLeave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Wow! This is an interesting build as I will essentially be doing the same thing......reconstruction a hillside patio (concrete, in my case) around a raised foundation WFO.
I will add your build thread to my 'closely following' list of threads. Thanks for the photos, they're very helpful...
Leave a comment:
-
Re: Greg & Karen's 42" Deck WBO in MI
Greg & Karen: nice start on your 42" wfo. The area you're putting it in at the edge of your deck looks really nice too. Can't wait to see the whole outdoor area done with those bricks you got. You're brave working on a build this late in the year but like Mike said on the last post, it's definitely do-able.
After you fill the cmu cells with concrete what's the upper slab pour going to be and are going with FB board only or a vermi-crete pour?
Just wondering because I see you've got 5 blocks high but the deck comes halfway up the lowest block? Anyway, nice build, thanks for posting.
Cheers, DinoLeave a comment:





Leave a comment: