OK so my 42" build has been going ok but now that I am getting near the top chains setting the bricks has been very slow. (See the attached photo of the jig I have been using.)
The problem I have is that I can only set one brick at a time and then have to wait for the mortar to set so the brick does not slip down befor moving on.
Anyone with ideas of a jig or method to hold the top most chains in place while the mortar sets please send your ideas/photos my way
Thanks
The problem I have is that I can only set one brick at a time and then have to wait for the mortar to set so the brick does not slip down befor moving on.
Anyone with ideas of a jig or method to hold the top most chains in place while the mortar sets please send your ideas/photos my way