wanted to put 4" of concrete super isol and 2" of vermiculite in that order. That will put my top of landing at 42.5". Two questions. 1. Is that to high? and 2. Can I pour the concrete slab, Put super isol on top with no adhesive and then pour the vermiculite over? I wanted to do this so I would not have to adhere super isol to vermiculite layer. Please let me know your thoughts thank you.
Carlo
Carlo
Comment