Hi folks,
I have a question for any of the experienced masons on the forum.
I will be using 2" wall caps to build counter tops around the oven dome. But I won't have time to install the counter-tops before winter hits (since I need to finish the BBQ grill foundations and this won't happen until next spring). But I want to finish the rock facade on the outside of the oven enclosure (I have enclosed the dome with steel studs and backer board).
For the facade I am using 3" wide ledgestones that I have been gathering in the hills of North Idaho. My plan was to install 2 1/2" angle iron at the base of the enclosure to support the facade (I plan to put temporary spacers under the angle iron where the wall caps will eventually fit).
Does anyone see a problem with this? I assume I need to use steel and not aluminum (although aluminum would be easier to work). Any recommendations would be welcome.
Good Roads
Harpist
I have a question for any of the experienced masons on the forum.
I will be using 2" wall caps to build counter tops around the oven dome. But I won't have time to install the counter-tops before winter hits (since I need to finish the BBQ grill foundations and this won't happen until next spring). But I want to finish the rock facade on the outside of the oven enclosure (I have enclosed the dome with steel studs and backer board).
For the facade I am using 3" wide ledgestones that I have been gathering in the hills of North Idaho. My plan was to install 2 1/2" angle iron at the base of the enclosure to support the facade (I plan to put temporary spacers under the angle iron where the wall caps will eventually fit).
Does anyone see a problem with this? I assume I need to use steel and not aluminum (although aluminum would be easier to work). Any recommendations would be welcome.
Good Roads
Harpist
Comment