  • SableSprings
    replied
    Re: plastering the supporting wall

    Originally posted by RichC View Post
    First scratch coat should be thicker if the two.
    What do I scratch with?
    Richard, we just took a narrow board (about your forearm's length) and put screws through it every inch or so. The screws went through about 1/2 - 1 cm, as long as they are even it doesn't matter how far they go through. Then you just drag the board over the first stucco coat and the screw tips scratch the surface nicely. The outer, 2nd, colored layer will dry fairly quickly if you don't mist/lightly wet the first layer - so you need to have everything ready, make more stucco than you need, work quickly, and relax...nobody will notice if you make a mistake or that the stucco's not "perfect" when they have a freshly baked pizza in front of them!

    Leave a comment:


  • CV_Oven
    replied
    Re: plastering the supporting wall

    We just used Quikrete Quikwall Surface Bonding Cement and acrylic fortifier, then added stucco color and covered with one coat. Just another option.

    Leave a comment:


  • stonecutter
    replied
    Re: plastering the supporting wall

    Scratch, brown, finish. Use more line with each layer.

    Leave a comment:


  • kbartman
    replied
    Re: plastering the supporting wall

    Originally posted by RichC View Post
    Hi, need some advice on this please. As I understand its a 2 coat process ( or us it 3 coats?). First layer needs to be scratched so second/final coat adheres to it. Can I leave a long gap in time between coats? I assume thats ok?
    First scratch coat should be thicker if the two.
    What do I scratch with?
    Am I making any obvious mistakes here?
    Any advice welcome

    Thanks

    Richard
    Here is a article that helped me gain some understanding of the stucco process.

    Hope this helps. I'm no expert but I'll try to help you if I can.
    Last edited by kbartman; 03-17-2014, 11:41 AM. Reason: spelling

    Leave a comment:


  • RichC
    started a topic plastering the supporting wall

    plastering the supporting wall

    Hi, need some advice on this please. As I understand its a 2 coat process ( or us it 3 coats?). First layer needs to be scratched so second/final coat adheres to it. Can I leave a long gap in time between coats? I assume thats ok?
    First scratch coat should be thicker if the two.
    What do I scratch with?
    Am I making any obvious mistakes here?
    Any advice welcome

    Thanks

    Richard