I have finished the perlite/cement oven floor, now to place it onto the cement top table. A question though, is it enough to simply put it onto the table and have it secured in placed under the weight of the oven and bricks? Or should I look to put some mortar or adhesive between the perlite floor and the hebel panels?
I've seen some people put sand between the table and perlite floor, but I feel this will cause the oven floor to sink down inconsistently once the actual weight of the oven is put onto the floor.
I've seen some people put sand between the table and perlite floor, but I feel this will cause the oven floor to sink down inconsistently once the actual weight of the oven is put onto the floor.