I'm looking at 45 bags of concrete mix to do the stand cores and the reinforced hearth....
any reason not to spring for the redimix truck and do the cores and the hearth at the same time?
It''s a pretty similar cost and no bags to carry or mix.....I can put a metal form on the edge of the concrete blocks inside or the cores and do one monolithic pour.
Whynot? any feedback? Seems like a no brainer for the cost differential!
XJ