hello everyone. I am well underway on building a 36" oven and am about to start the brick dome. I have checked on the instructions and a lot of posts but i dont see instructions on a clear way to do the connection from vent bricks to dome bricks. Some people do a vent arch with full 4.5x9" bricks and then cut the dome bricks to meet that. Others bring the vent bricks into the chamber a little more and carve out the 36" angle into them. Trying to figuire out what way is easiest?
Where do you start the vent arch bricks, in terms of relatio to the dome.
I have also seen various opening sizes for vent arch and am looking to go with 18" wide x 12" high at the high point of arch and bring that down to 10" at sides? too low or should it be a little higher?
There is also some conflicting info about the actual chimney opening. I am going to use a 6" metal chimney double wall ( oven is outside). I am wondering is it best to do a tapered opening in brick from large at bottom to smaller at the top where chimney connects or is a sqare hole bigger that the chimney size ok?
Thanks for any help anyone can give as i just want to get it right.
Cheers, Nick
Where do you start the vent arch bricks, in terms of relatio to the dome.
I have also seen various opening sizes for vent arch and am looking to go with 18" wide x 12" high at the high point of arch and bring that down to 10" at sides? too low or should it be a little higher?
There is also some conflicting info about the actual chimney opening. I am going to use a 6" metal chimney double wall ( oven is outside). I am wondering is it best to do a tapered opening in brick from large at bottom to smaller at the top where chimney connects or is a sqare hole bigger that the chimney size ok?
Thanks for any help anyone can give as i just want to get it right.
Cheers, Nick