Hi all, my son and i just dug about a inch of vermiculate out of the top slab. It had been a week and still soft. I guess i want a form base to work on. I am now thinking of just using concrete blend and mixxing some vermiculate in with it.
I am going to lay anther layer of chicken wire down then my mix of 50 concrete blend to about 40 of the vermiculate and a good amount of cement.
Will this be ok my oven will only be used now and again just to cook a couple of pizzas or a roast.
Thanks for any feed back
P.S i am worried about the slab cracking if it does can it just be filled in so it does not look to bad
cheers all
I am going to lay anther layer of chicken wire down then my mix of 50 concrete blend to about 40 of the vermiculate and a good amount of cement.
Will this be ok my oven will only be used now and again just to cook a couple of pizzas or a roast.
Thanks for any feed back
P.S i am worried about the slab cracking if it does can it just be filled in so it does not look to bad
cheers all
Comment