This question was addressed in another thread, some concerns came up, then the thread kind of fizzled before I could get clarification on the details.
My enclosure will consist of poured, formed vermicrete, not a hand-molded vermicrete dome. The structure will have square vertical sides. I had originally intended to form the pour with wood, then perhaps wrap the vermicrete structure in chickenwire after it cured before applying SBC.
However I am now strongly leaning toward walling the vermicrete off with hardibacker to strengthen the sides and support the square corners (along the top edge).
I can think of two ways of doing this:
Clearly, I was planning on the second method. However, I'm not at all convinced that merely pouring vermicrete into a hardibacker form will force the two to adhere to one another. When this came up before, it was suggested I mortar the hardibacker to the vermicrete, but I don't understand how to do that if the hardibacker comprises the form. Should I actually slather the inside the hardibacker with mortar immediately before pouring the vermicrete in? The seems a little odd.
Any thoughts on this?
Thanks.
My enclosure will consist of poured, formed vermicrete, not a hand-molded vermicrete dome. The structure will have square vertical sides. I had originally intended to form the pour with wood, then perhaps wrap the vermicrete structure in chickenwire after it cured before applying SBC.
However I am now strongly leaning toward walling the vermicrete off with hardibacker to strengthen the sides and support the square corners (along the top edge).
I can think of two ways of doing this:
- Form with wood, pour and cure the vermicrete, then mortar the hardibacker against it.
- Form the pour with hardibacker and be done with it.
Clearly, I was planning on the second method. However, I'm not at all convinced that merely pouring vermicrete into a hardibacker form will force the two to adhere to one another. When this came up before, it was suggested I mortar the hardibacker to the vermicrete, but I don't understand how to do that if the hardibacker comprises the form. Should I actually slather the inside the hardibacker with mortar immediately before pouring the vermicrete in? The seems a little odd.
Any thoughts on this?
Thanks.
Comment