I have just covered my WFO with two layers of insulation blanket and I am hoping to cover the dome with the 4 to 5 inches of refractory insulator.
I would like to know if there is a time frame I should wait before firing the WFO after applying the 4 to 5 inches of refractory insulator, or doesn't it really matter? For what it's worth im using Sheralite which is allot easier to apply then Vermiculite and it's just a later technology version of vermiculite? Although both do the same thing.
I'm not sure if it's worth me writing this extra stuff but I may as well so you have ALL the details.
The ground foundation has been done over 6 months ago.
I done a 4 inch slab of concrete and rio and another 4 inch slab of refractory insulator on top of the concrete one and these were finished about 3 months ago. The dome using fire bricks has been done about a month ago.
Your advice is much appreciated.
Regards
Dean
I would like to know if there is a time frame I should wait before firing the WFO after applying the 4 to 5 inches of refractory insulator, or doesn't it really matter? For what it's worth im using Sheralite which is allot easier to apply then Vermiculite and it's just a later technology version of vermiculite? Although both do the same thing.
I'm not sure if it's worth me writing this extra stuff but I may as well so you have ALL the details.
The ground foundation has been done over 6 months ago.
I done a 4 inch slab of concrete and rio and another 4 inch slab of refractory insulator on top of the concrete one and these were finished about 3 months ago. The dome using fire bricks has been done about a month ago.
Your advice is much appreciated.
Regards
Dean