If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
If you can bear to wait, covering the slab to hold in the moisture can substantially increase its strength. The industry standard is 28 days, but at least a week can make a huge difference.
Either of those should be fine. Ideally the whole thing is best sealed, but it may not be practical to seal up the underside, so just covering the top surface will stop sun and wind from drying it out.
Comment