Hand mixed the perlite/vermiculite/cement mix at 2.5 : 2.5 : 1. Bucketed it up to form and screed off. The added weep holes worked as expected. Will leave now to dry out before adding a fine layer of bedding sand to lay floor bricks.
New member, new build.
Collapse
X
-
-
Just a heads up. You are putting a lot of effort into this build and we all want the oven to be a success. I am concerned that the 2.5 to 1 pcrete ratio is not going to give you the needed insulation in the floor. I sent out a post showing the K values of pcrete and recommended 5 to 1 with a min of 4" with 6" better since it takes almost twice the thickness of pcrete vs CaSi board. This post, unfortunately went out when the site was hacked so I do not know if you saw it or not. There are a couple options, add another more pcrete (5 to 1) or add layer of CaSI. Proper floor insulation as well dome insulation is key to an effecient oven. Just trying to watch out for you and all your hard work.Comment
-
So UtahBeehiver the mix I have done of perlite/vermiculate (5) to cement (1) won’t be sufficient?Comment
-
In the post, I thought it said 2.5 to 1 not 5 to 1. 5 to 1 is the correct ratio structural rating for a floor. It has a K value of around 0.72-75ish with CaSi having a K value (depending on temp) of around 0.5. Our rule of thumb (conservative) is twice the thickness of pcrete to CaSi thickness. Bare minimum floor thickness of 5 to 1 pcrete is 4" if the ratio is 2.5 to 1 then the K value really shoots up. If it was a typo on the post 2.5 to 1 and is really 5 to 1 ratio you will be at the minumum recommended floor insulation.Comment
-
I went and read the post closer, so it is 5 to 1 half perlite and half vermiculite to portland. It will still be at the lower end of the insulation scale. If you are wanting to do serious extended cooking, brick heat saturation is most important with minimum K value. The insulation on current oven will be fine for pizzas and some extended cooking. So it is up to you. Sorry I misread the post.Comment
-
Because a vermicrete/perlcrete mix requires so much water in the mix there is more than double that which is required for adequate hydration, so damp curing to enhance strength is less of a problem. It is the elimination of the freee water that is the greater problem. Read my attached experiment on drying a vermicrete slab.
If it were mine I'd be covering it for a few days to hold the moisture in the surface, then allowing sun and wind to do its thing for a couple of weeks before covering it with floor bricks.
A 5:1 vermicrete is not quite as good an insulator as cal sil board, whereas at 10:1 it's equivalent to blanket and cal sil, but not strong enough to support the weight of the oven and floor. That is why we recommend 5:1 under the floor, but 10:1 over the blanket if you want the superior insulating quality.
You will need to decide if you want the dome outside the floor or on top of the floor. There are pros and cons for both methods, discussed somewhere on the forum. My preference is to build the dome on top of the floor which reduces the need for very precise cuts at the perimeter of the floor bricks.
Vermicrete insulating slab PDF.pdf
Attached FilesLast edited by david s; 11-13-2026, 11:35 PM.Kindled with zeal and fired with passion.Comment
-
After reading your post UtahBeehiver I decided to put my form work back on and raised it an inch above existing Perlite/vermiculite base , I then made another batch of 5:1 perlite cement to go on top. Having not quite enough to do the front landing again I went with a vermiculite/fine sand/cement mix to finish it off. If anything the floor height is a little higher which is a good thing for me. DavidS I am having the outside of the dome on top of the wfo brick floor.1 PhotoLast edited by The foxdale phantom; 11-12-2026, 03:06 PM.👍 2Comment
-
Good call on adding an additional layer of p/vcrete and placing the dome on the brick floor as suggested by David S. All is looking good now. Looking forward to the rest of the build.Comment
-
I’m using reclaimed bricks and starting on the oven floor, i will be using a fine sand left over from the block layer to bed them. My Q’s is with some inconsistency in the brick dimensions ( which some I have cut ) is there a preferred product to fill those minor gaps?Comment
-
To achieve a level floor a layer of 50/50 dry sand and bricklayers clay works well as a leveller. Any gaps between the bricks will fill with ash from the fire so don’t worry about them. Floor bricks laid loose like this allow for individual brick expansion as some will get hotter than others. It also allows for easy replacement should any spall. (It is only ever the bricks in the centre of the floor that are vulnerable).Last edited by david s; Yesterday, 11:14 AM.Kindled with zeal and fired with passion.Comment
-
Thanks david s . Great to have someone on the same time zone to promptly responded to my query’s
Soooooo….. could I possibly use ash to fill the gaps prior to firing?
Last edited by The foxdale phantom; Yesterday, 11:44 AM.Comment
-
I guess you could, but why would you want to. You will be be having a fire and creating ash every time you use it.
I’m concerned that you’ve not given your vermicrete layer sufficient drying time before covering it with floor bricks, thereby locking in a lot of water which takes ages to eliminate by fires. Sun and wind are the best driers, but cover it if it looks like raining.Last edited by david s; Yesterday, 09:10 PM.Kindled with zeal and fired with passion.Comment
-
Dave is right on the water content in the floor p/vcrete. It may look dry but there is a ton of water in the sublayers. If you cover the insulation with the floor bricks, it makes the removal of the water much more difficult. Wet or not enough insulation is one of the key reasons for poor oven performance.Comment