New member, new build.

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • david s
    Il Pizzaiolo
    • Mar 2007
    • 9213

    #46
    The insulating slab doc I posted on no.36 explains the importance of of drying a vermicrete slab preferably by sun and wind and provides an indicated time line. You could try buying a cheap garden moisture meter and pushing its probe into the slab.
    some builders have reported taking months to dry vermicrete slabs by fire alone.
    Last edited by david s; Yesterday, 11:51 AM.
    Kindled with zeal and fired with passion.

    Comment

    • david s
      Il Pizzaiolo
      • Mar 2007
      • 9213

      #47
      A1.125m (44”) diameter circle, 10cm thick would be a volume of 99.4 L (call it at least 100L when the entry bit is added on). As vermicrete requires 4L water/10L of vermiculite aggregate, that’s 40L of water added for your mix. As less than half is taken up in the hydration process, an enormous amount of water is still trapped in the mix. How long would it take to boil dry a 20L (5.2 gallons) drum of water by fire?
      (This is where the extra expense of cal sil can be a preferred option because it has already been dried as part of its manufacturing process).
      Last edited by david s; Yesterday, 06:34 PM.
      Kindled with zeal and fired with passion.

      Comment

      Working...