I am curious about the time it takes people from start to finish. My brother and I built our first one in 8 days. Two tow build the base, three to build the dome, two to insulate and stucco, and one to tile the base. There was also a day after that we used to clean up the area, install the soapstone cooking surface, and build the aluminum door.
How long does it take everyone else? I don't know if I can post pics on here, but I have them on face book. Thanks oven builders.
How long does it take everyone else? I don't know if I can post pics on here, but I have them on face book. Thanks oven builders.
Comment