Building the fire brick transition
Last year I had completed the dome, and the side walls of the entry. I started brick cutting by raising the side walls up above the dome, and squaring up the hole.
Another view:
This piece of luan is the shape of the bottom of the funnel
Announcement
Collapse
No announcement yet.
dmun's 36" geodesic oven part II
Collapse
X
-
dmun's 36" geodesic oven part II
This post continues the construction of my oven - Part one was in the pompeii thread, and last year's masonry season ended with the oven built and the enclosure built up above the dome.
So: Spring is here, the birds are singing, the flowers are blooming,
and it's time to get back to work.
I first used refractory mortar to attach the two halves of the refractory flue tile funnel together:
I need to offset the flue to make room for the things that are going in above the oven, so the funnel gets tilted back and to the right:
Measuring the amount of bottom tilt needed to make the right side vertical.Tags: None