Those chimney blocks were heavy. There was no way for one person to carry them up a ladder, and no room for two.

Here's a winch, improvised from a big winding barrel from my tower clock. There's a pulley mounted at the top of the tower, and another one on the clamp jig, to compound it once. A direct lift was possible with the flue tile shown here, but not the chimney block.

Here's a chimney block on the way up. Every other block got one side cut off, to avoid a running seam going up the chimney, so there were only three full blocks to lift. Three were enough. Even the cut ones were super-heavy.

Swinging sideways into position.
Leave a comment: