This post continues the construction of my oven - Part one was in the pompeii thread, and last year's masonry season ended with the oven built and the enclosure built up above the dome.
So: Spring is here, the birds are singing, the flowers are blooming,
and it's time to get back to work.
I first used refractory mortar to attach the two halves of the refractory flue tile funnel together:
I need to offset the flue to make room for the things that are going in above the oven, so the funnel gets tilted back and to the right:
Measuring the amount of bottom tilt needed to make the right side vertical.
So: Spring is here, the birds are singing, the flowers are blooming,
and it's time to get back to work.
I first used refractory mortar to attach the two halves of the refractory flue tile funnel together:
I need to offset the flue to make room for the things that are going in above the oven, so the funnel gets tilted back and to the right:
Measuring the amount of bottom tilt needed to make the right side vertical.
Comment