I'm using a clay flue liner for a chimney. I'm adding a 1" layer of perlcrete and a stucco render so that it doesn't crack and so it looks better. I'm applying the perlcrete to one side at a time with the flue liner laying horizontal. About how long should I wait before rotating the flue pipe 90° to do the next side? I want to be sure that the already applied sides are well adhered so they don't pop off when doing the next side. Thanks.
Announcement
Collapse
No announcement yet.
How long does it take perlcrete to set on clay flue liner?
Collapse
X