After lurking and a few dumb questions I am now ready to start what I hope ends up being a WFO as nice as the ones I have seen on the forum. Since I am retired and in the final stages of haing a house built I have no real interest in the manual labor it takes to build an oven. I have found a "contractor" that has built ovens before and is willing to make adjustments to the build. Also he thinks he can finish in 15 days which probably means 30 but much quicker than I could do.
My house contractor is pouring the slab on Monday, since I am never sure what kind of quality I get here my slab will be 25 cm (10") thick with rebar in the area of the oven....corner build.
The pic below is of the forms, note that they are not exact, the tile guy will finish to the correct size...that's the way it is. If too large they cut to size. They love to put concrete in and then drill, chop and cut a few days later. Labor is cheap.
I will post pics and any comments will be appreciated. BTW the actual hearth and oven build will not start until March 15th.
Cheers,
Mike
My house contractor is pouring the slab on Monday, since I am never sure what kind of quality I get here my slab will be 25 cm (10") thick with rebar in the area of the oven....corner build.
The pic below is of the forms, note that they are not exact, the tile guy will finish to the correct size...that's the way it is. If too large they cut to size. They love to put concrete in and then drill, chop and cut a few days later. Labor is cheap.
I will post pics and any comments will be appreciated. BTW the actual hearth and oven build will not start until March 15th.
Cheers,
Mike
Comment