Howdy, fellas. So this summer I'm going to build us a pizza/bread oven. For obvious reasons the first thing I'm concerned about is the base its built upon. I'm in central Missouri and our worst case scenario frost wise is in the 30" range as I understand it. I'm planning on digging down to about 40" and building the foundation from concrete block tied together and reinforced with rebar and concrete in the hollows.
I was thinking for the pad I'd dig down about 18" in the center, pack in about 12" of crushed stone and then pour a 6" slab reinforced with wire and rebar.
Now, my question is: does this sound right? Will this keep me out of trouble down the road?
TIA.
Rick.
I was thinking for the pad I'd dig down about 18" in the center, pack in about 12" of crushed stone and then pour a 6" slab reinforced with wire and rebar.
Now, my question is: does this sound right? Will this keep me out of trouble down the road?
TIA.
Rick.
Comment