After quite a bit of prep work I finally stepped into construction of the oven itself. Steps of Foundation and oven base can be found here :
https://community.fornobravo.com/for...-really-enough
vermiculate-concrete Hearth sits on top of 4" structural slab. It is 5" thick to match the height of front face bricks and oven floor. 2" of rockwool rigid insulation sheet is embeded under the brick floor.
Gave the hearth few days to harden and laid the floor bricks . 1:1 mixture of sand and fireclay is heaven to work with.
my biggest effort of these 3days however was the Argentinian grill section that I'm building as part of the project. Started lining the walls firebrick (my brickwork improved substantially) and my pride and joy - entry Arch .
https://community.fornobravo.com/for...-really-enough
vermiculate-concrete Hearth sits on top of 4" structural slab. It is 5" thick to match the height of front face bricks and oven floor. 2" of rockwool rigid insulation sheet is embeded under the brick floor.
Gave the hearth few days to harden and laid the floor bricks . 1:1 mixture of sand and fireclay is heaven to work with.
my biggest effort of these 3days however was the Argentinian grill section that I'm building as part of the project. Started lining the walls firebrick (my brickwork improved substantially) and my pride and joy - entry Arch .
Comment