We've put our Ristorante 130 together and are about to apply the mortar to the joints.
The arch fits in a way that there is a large gap between the oven floor and the landing.
Which is better:
Fill the large gap with mortar?
or
Grind down the back of the arch to get a better fit?
The arch fits in a way that there is a large gap between the oven floor and the landing.
Which is better:
Fill the large gap with mortar?
or
Grind down the back of the arch to get a better fit?
Comment