Here's the start of the patio project, slab for kitchen island and Casa 100 oven was 12" thick.
Contractors did the patio pavers and firepit.
I did the propane gas plumbing, electric, block work, forming, ect... TON of work so far. Going on 3 months now.
Toughest job so far was probably the drainage tile work my dad and I did. 60' of 4" drainage tile, dumps into a 12" surface drain box, then 6" drain line extends 150 ft. to the back of our lot.
Contractors did the patio pavers and firepit.
I did the propane gas plumbing, electric, block work, forming, ect... TON of work so far. Going on 3 months now.
Toughest job so far was probably the drainage tile work my dad and I did. 60' of 4" drainage tile, dumps into a 12" surface drain box, then 6" drain line extends 150 ft. to the back of our lot.