Remove sand & Damp Cure
Around 24 hours after finishing the cast I removed the previously applied plastic wrap and towels. Towels were still fairly damp (despite almost 100F heat here in Texas). I dug out most of the sand and styrofoam, then liberally sprayed/misted inside/outside with water, reapplied damp towels and plastic wrap.
I assume 24-48hrs is ideal time to patch up any internal voids, but I might not get to this until tonight or tomorrow night (which will be 48-72hrs after cast). As sealed off the damp towels and entrance is, I'm hoping it will still remain damp enough for good adhesion. Plus side is that it will be very humid/raining for next couple days, so easier to keep everything damp during curing in 90%+ humidity!
This weekend I will add the foam gallery mould and cast it. A little concerned I will not have enough clay for that process which would delay that a week.
Around 24 hours after finishing the cast I removed the previously applied plastic wrap and towels. Towels were still fairly damp (despite almost 100F heat here in Texas). I dug out most of the sand and styrofoam, then liberally sprayed/misted inside/outside with water, reapplied damp towels and plastic wrap.
I assume 24-48hrs is ideal time to patch up any internal voids, but I might not get to this until tonight or tomorrow night (which will be 48-72hrs after cast). As sealed off the damp towels and entrance is, I'm hoping it will still remain damp enough for good adhesion. Plus side is that it will be very humid/raining for next couple days, so easier to keep everything damp during curing in 90%+ humidity!
This weekend I will add the foam gallery mould and cast it. A little concerned I will not have enough clay for that process which would delay that a week.
Comment