Re: Pensacola Build
Next step after the cabinet area was the bars on either side. I hadn't filled the cells of the block walls where the bars go, so I formed the bars with rebar going all the way down the side walls. I had to glue the top 2 layers of block together with construction adhesive so they wouldn't move as the forms were being built. Each bar and wall took 8 bags of Maximizer. I also used Thompsons water seal (spray can), in the forms for release agent. All worked well.
Next step after the cabinet area was the bars on either side. I hadn't filled the cells of the block walls where the bars go, so I formed the bars with rebar going all the way down the side walls. I had to glue the top 2 layers of block together with construction adhesive so they wouldn't move as the forms were being built. Each bar and wall took 8 bags of Maximizer. I also used Thompsons water seal (spray can), in the forms for release agent. All worked well.