    Re: PC's 42" Build

    Hi Bill,
    Good to see your started your oven and are going strong. I was reading all the work you have planned and WOW, you are ambitious! I had to take a break from just reading all the work ahead of you!
    Good Luck Can't wait to see more!
    John
    Build Thread:http://www.fornobravo.com/forum/f8/i...ome-15521.html
    Photos: http://groups.yahoo.com/group/brick-...67884/pic/list
    Oven Blog: http://johns-brickoven.blogspot.com/...ven-folly.html

    Comment


    • #17
      Re: PC's 42" Build

      I've made a tad more progress in my WFO / Outdoor Kitchen build. I poured another slab yesterday. I'm up to 53 80lb pound bags of concrete mix now and about 150 pounds of portland so far. I've still got 47 bags in my garage. I went through my first load of 50 and had another 50 delivered. I'm really physically tired of hauling so much weight around in the abnormally high temperatures we've been having here, this past week hovered around 100F and was fully humid....working like that has worn me out. But I'm seeing a bit of light now at the end of the tunnel now with my smallest slab pour remaining.

      This week formed up and poured the grilling leg of my kitchen area. This leg is 9 feet long. Yeah seems kinda long but my plan is to have 3.5 feet of smooth counter space immediately to the left of the WFO for forming the pizza shells and then a 32" wide charcoal grill next then a 14" wide propane side burner next and finally a tad (1.5 feet) of counter space just past the side burner. If you see the pics you will see my pvc provisions for some drainage around the kitchen area as well as a 1" electrical conduit for connecting electrical between the left grilling leg of the kitchen and the right leg of the kitchen which will be the sink / bar area. That side will have a small sink and a built in Ice Chest / Cooler. It will be shorter in length probably 6.5 to 7 feet in length.

      I'm not going to start building my oven base until I have all three base slabs poured I suspect I will finish the final slab by next weekend.

      Anyhow if your interested I've attached a few pics.

      Bill
      My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html

      Comment


      • #18
        Re: PC's 42" Build

        FINALLY!!!!!! I get to start going up now instead of just working horizontally. I finished my final foundation slab this morning as I pulled the forms and now have the foundation for my oven, grilling facilities, and sink/bar facilities in place. I can now begin bringing up the oven stand!

        I've attached pictures to this post in the pics you can see the "L" shape of my outdoor cooking area and you can see provisions for drains and drainage, electrical, etc. I even left an opening in my sink side slab for access to the water and drain line should any problems arise and I need to repair. Once I'm done though I'm going to fill this area in with some pebbles and cover it with a piece of 1/2 inch ply....I created an 1/2 recess around the opening so I can pop in a cover over my access opening.

        The last two weeks of extreme heat have really slowed me down a bit it's been 100-104 deg. F and fully humid for about a week now and it's worn me out.

        But for now I'm pumped because the back breaking foundation work is done.
        Now time for the back breaking WFO stand! LOL


        Bill
        My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html

        Comment


        • #19
          Re: PC's 42" Build

          Well after a tough summer I am back to working on my build. I had finished my foundation work and began going up with the cinderblock walls of the stand in early July. Well, it was the start of Texas's worst ever heat wave and drought and I was working on a Friday for about 5 hours on a day where it hit 105F and I got hit with heat exhaustion or something. I went from being hot and sweaty to being cold and dry and really sick to my stomach. I dropped everything went in the house and to a cold shower and threw up and was quite sick the rest of the weekend. I decided then that I would not work again on the project while the heat of summer was so intense, I really want the WFO but it's not worth dying over. I had no idea the heat wave would be as severe as it has been but now that it's well passed I'm back out there working and hope to have my top slab poured by Thanksgiving and begin working on the
          oven itself.

          I'll try to post some current pics when I get a chance.

          Bill
          My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html

          Comment


          • #20
            Re: PC's 42" Build

            Hey Bill,

            Great start on your WFO and great layout! I have a similar layout, with firepit, wood grill and plenty of countertops. It's an "L" shape corner build as well. Don't worry about taking too long, I'm going on 3 years, but it's finally coming together!

            Keep building and you'll get there. Good luck and post pics!

            aceves

            Comment


            • #21
              Re: PC's 42" Build

              I've made some progress on my build after quite a few delays, mostly weather delays.

              I am mixing my own hi-temp mortar, as are most of you guys I am sure.

              I Found the medium duty firebricks for $1.43 each, maybe I bought too many as I bought 210 so I could use them for the floor too and have some spares in case I mess up.

              So far the process has been hard on my hands (see pic below) but easier than I thought. Laying out the oven and getting the floor bricks cut took a good while as it's a lot of cutting. I'm cutting with one of the Harbor Freight $189 wet saws and a $70 diamond blade from HD and it is working fine.

              I am at the point where my first, soldier course is up and mortared in place. I cut the soldiers in half rather than leave them full height as I am shooting for a internal height of 17". I don't want to exceed 19" so I figured if I shoot for 17" I've got some room for error.

              See the progress in pics:

              The top slab poured: Click image for larger version

Name:	photo-4.JPG
Views:	1
Size:	181.9 KB
ID:	288845


              The floor of the oven laid out and cut: Click image for larger version

Name:	photo-5.JPG
Views:	1
Size:	136.4 KB
ID:	288846

              The entry to the oven built, mortared and level: Click image for larger version

Name:	photo-7.JPG
Views:	1
Size:	166.5 KB
ID:	288847

              The entry with the arch to the dome area built and mortared, built this arch first so I could build the dome up to it. Note that I left two full sized bricks to extend out from the side of the oven entry dome so that I could tie in my dome and entry very well. I also cut my bricks that transition into the dome from the entry on 45 degree angles so that this area would be very sturdy: Click image for larger version

Name:	photo-9.JPG
Views:	1
Size:	700.4 KB
ID:	288848

              I found it difficult to work with gloves on, especially the working of the mortar between bricks. I wanted the oven opening area to look great so I worked all the mortar in this area with my bare hands, but you pay a price for that. Between the friction and the irritation that comes from the portland and lime in the mortar you fingers get outrageously sore:
              Click image for larger version

Name:	photo-10.JPG
Views:	1
Size:	75.9 KB
ID:	288849

              I hope to work some more this week but we have a lot of rain coming through over the next couple days and that will probably hold me up some.

              Let me know if you have any questions or comments! I'm happy to be this far along now with my oven / outdoor kitchen project. The initial plumbing, electrical conduit running, foundation work and oven base building were back breaking. I hauled around 140 bags of 80lb premix concrete around my house not to mention rebar, concrete blocks, etc, etc. The oven building part is quite fun in comparison. Even if my fingers are a bit sore, ok they are really, really sore! LOL
              My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html

              Comment


              • #22
                Re: PC's 42" Build

                Good progress Bill! As to those "injured fingers", buy yourself some cheap white vinegar and liberally wash your hands with it after working with mortar/cement. The weak acid of the vinegar neutralizes the lime and really makes a difference helping your hands heal.

                I also like to work without gloves, but the thin, blue nitrile ones really do a good job of giving you protection and "touch control"...even when you double up the gloves for an extra layer of safety.
                Mike Stansbury - The Traveling Loafer
                Roseburg, Oregon

                FB Forum: The Dragonfly Den build thread
                Available only if you're logged in = FB Photo Albums-Select media tab on profile
                Blog: http://thetravelingloafer.blogspot.com/

                Comment


                • #23
                  Re: PC's 42" Build

                  Thanks! I will try the vinegar to neutralize the mortar. I did pick up some thin latex gloves to help me keep my skin on my hands! LOL
                  My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html

                  Comment


                  • #24
                    Re: PC's 42" Build

                    Years ago when I did this for a living I would coat my hands with mineral oil (baby oil with out the smell) before going to work. It helped to keep the mortar out of the pores, cuts, nicks etc. Back then I had no fingerprints .
                    Now, I'm a wuss . I use the un-powdered exam gloves. I get them in a box of 100 and change gloves every break. I do use cut resistant gloves for the wet saw and when I am moving large amounts of brick.
                    Joe Watson " A year from now, you will wish that you had started today" My Build Album / My Build

                    Comment


                    • #25
                      Re: PC's 42" Build

                      Thanks!

                      I will definitely try the mineral oil and couple that with washing up with vinegar!

                      Bill
                      My Build Thread: http://www.fornobravo.com/forum/f8/p...ild-15822.html