As you guys can see my Join Date was 08-09-2008. I have been researching for almost a full 3 years. Time and Money have been the two big problems. I broke ground when school got out. I just have been trying to do as much as I can myself. So here goes with my build.
My plan is to build a WFO, Parrilla, and fireplace. I am not sure how far I can get before I return to work. But, I will do what I can.
So far I have dug out the area 35'X14'. Installed water, drains (I burried two 55 Gallon drums that had the bottoms removed, I filled them with drain rock put the lid back on and covered up) and electricial. I installed 3 inches of road base and 4 inches of concrete, 7 inches in the WFO area, wire mesh and rebar. Then the day of the pour it rained hard. We had to tent the area. I did pay a local guy to finish and stamp the pad. We poured the outdoor kitchen pad and a firewood pad which worked out to be 8 yards. It is time tomorrow to start the block stand.
Here are some early pictures. More to come as I go along.
I do still need to buy fire bricks. I do need 9 dark ones for an idea I have. Has anyone ever used the black ones. Can't say what I am doing with them you will have to follow along to see.
Thanks Johnfm43
Helpers in the one pictures brought me drain rock to fill up the drums.
Attached Thumbnails
I know that this is the same post as in Getting started. But, I did not know how to move thread to the right location.
My plan is to build a WFO, Parrilla, and fireplace. I am not sure how far I can get before I return to work. But, I will do what I can.
So far I have dug out the area 35'X14'. Installed water, drains (I burried two 55 Gallon drums that had the bottoms removed, I filled them with drain rock put the lid back on and covered up) and electricial. I installed 3 inches of road base and 4 inches of concrete, 7 inches in the WFO area, wire mesh and rebar. Then the day of the pour it rained hard. We had to tent the area. I did pay a local guy to finish and stamp the pad. We poured the outdoor kitchen pad and a firewood pad which worked out to be 8 yards. It is time tomorrow to start the block stand.
Here are some early pictures. More to come as I go along.
I do still need to buy fire bricks. I do need 9 dark ones for an idea I have. Has anyone ever used the black ones. Can't say what I am doing with them you will have to follow along to see.
Thanks Johnfm43
Helpers in the one pictures brought me drain rock to fill up the drums.
Attached Thumbnails
I know that this is the same post as in Getting started. But, I did not know how to move thread to the right location.
Comment