    Re: May be starting my 42" Pompeii in NYC this week...

    Thanks for the tip, John. I already cut my floor bricks into a circle. I planed on just laying the wall bricks around on top of the vermiculite and mortaring only the back joints while leaving the small air gap between the floor bricks and wall bricks. Any thoughts on this guys?

    Leave a comment:


  • Aegis
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Hi, You are going great guns so far, keep up the good work! From personal experience I would HIGHLY recommend putting your solider course on top of you hearth bricks. I would not mortar them down to allow for expansion. I have an extremely nasty crack that I can only attribute to having the gap between my wall and hearth have some firebrick pieces or mortar. When curing the oven the floor expanded and pushed on the soldiers enough to separate them and have a large see through crack. I also blame my self for probably not having the mortar mixed properly when that first couple of bricks were set as I am (was) a total novice at mortar mixing. But the main culperit was the soldiers around the floor. I think someone here mentioned that you will probably never replace a hearth brick next to the wall so why cut all those hearth bricks into a circle. If you still want to do the inside heart set up make sure you stuff cardboard in between the hearth bricks and wall so you have a good chance of not repeating my mistake.
    Good Luck
    John

    Leave a comment:


  • Faith In Virginia
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Remember it's recommended NOT to mortar in your floor. Use the fire clay and sand mix for that.

    faith

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Ok just picked up 4 bags of heatstop50. Hope it's enough for the entire project.

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    If it doesn't rain tomorrow, I hope to lay the floor in place and maybe do the first course. Can I use the premixed bucket of refractory cement from my local masonry yard?

    Leave a comment:


  • Faith In Virginia
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Well the point with the ratio by volume is for the maximum insulation value. Vermiculite is the insulation the Portland cement is the binder. The common ratio is 5 to 1 or 6 to 1. I used a large ice cream bucket as my standard unit of measure.


    Edit I re- read the amounts of vermiculite to portland that you actually used and that does sound right. the more it cures the stronger it gets.

    Faith
    Last edited by Faith In Virginia; 08-22-2011, 06:46 PM.

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Thanks a lot. I appreciate the kind words. I trusted a "professional" on my dime and got a dud. Not gonna happen a second time.

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Got some firebricks and laid out the floor, marked the 42" diameter and cut the edges round. Next I need to measure and cut the vent landing floor but will take tomorrow off to rest.

    Forms removed.

    130 bricks picked up this morning to start floor.

    Laid out and marked.

    Cut and ready.

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    It dried pretty hard today. The edges are brittle but the center is dense. I can put a dent in it with my finger but when I press with my hand it seems pretty strong. I'm thinking to martyr up around it this way it is all held in around the edges. Thoughts?

    I'm also going to post photos of today's work in a minute.

    Leave a comment:


  • rodeair
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    NYC - I would be sure your vermicrete was mixed properly before you start building on it. I know it's recommended to have a 5:1 mix for the insulation layer, I don't know how a lighter mix would hold up. If your bags of vermiculite were 4 cuft each, your mix was approx. 15:1. A 94 # bag of portland is exactly 1 cuft. So if you used 14 cuft of vermiculite, you would have needed almost 3 bags of portland for the 5:1 ratio by volume.
    Leigh

    Leave a comment:


  • Faith In Virginia
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    How did you measure your mix? A 5 to 1 mix should have been by volume.

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Well, my point is that it probably was less portland than 5:1 ratio as the V bags are much much larger than a portland bag. I don't want to beging an oven only to have it crumple with 5.5" of stuff underneath it that may be structurally sound.

    Leave a comment:


  • Faith In Virginia
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Nope.... a 5 to 1 mix comes out quite strong. I did a test piece 2" thick and let it cure. I beat the snot out of it and it got a few dents but still held together great. So build away!

    Your project is looking great!

    Faith

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    By the way, I used 3.5 bags of vermiculite and only 2/3rds bag of portland. Seems like too little portland based on some of the mixes I've read here. It did seem to coat well when I dry mixed it and did seem to begin hardening. Will this cause an issue with crumbling under the weight of the oven?

    Leave a comment:


  • NYC
    replied
    Re: May be starting my 42" Pompeii in NYC this week...

    Great, thank you. I will mortar around the edges after removing the forms. I hope it hardens more because right now I can press an indent into the vermiculite layer and it's going to hold 3,000lbs on top.